Contact Us

Use the form on the right to contact us. 

You can also email us at lramos@unitedenergycorp.net or call us at (732) 994-5225 

3526 US Hwy 9 South - Ste. 303
Howell, NJ 07731
United States

Well – Ven GS 230

  Well
Name
Type of well Well depth in
feet
Water
amount
%
API date of
initial
treatment
  GS 230 Gas lift 4380 22% 27.3 26-Jul-04
Well
problem
High Parrafin Build up and high parrafin in the crude
Solution Mix 4 drums of KX-91 with 140 barrels of oil and pump downhole. Wait
48 hours before starting well production. No Continuous Injection.


GS 230 oil production (BNPD)
Before 12
After 156
Increase 144
Perc. Increase 1200%



Well GS 230