Contact Us

Use the form on the right to contact us. 

You can also email us at lramos@unitedenergycorp.net or call us at (732) 994-5225 

3526 US Hwy 9 South - Ste. 303
Howell, NJ 07731
United States

Well – Ven GVJ-6

  Well
Name
Type of well Well depth in
feet
Water
amoun
t %
API date of
initial
treatment
  GVJ-6 pumping well 4940 30% 13.9 18-Jun-04
Well problem High pressure 800 to 1000 psi in the well head
Solution Mix 4 drums of KX-9 and 1 drum of KH-30 with 265 barrels of gasoil
and pump downhole. Wait 48 hours before starting well production.
No continuous injection.


GVJ-6 oil production (BNPD)
Before 89
After 158
Increase 69
Perc. Increase 78%