| Cost benefit KH-30 Continuous Injection | Per Well Monthly | Per Well Yearly |
| Frequency of treatments | 1.50 | 18 |
| Cost per treatment | $ 475 | $ 5,700 |
| Overhead costs (perc.of treatment costs) | 15% | 15% |
| Total Costs of Hot Oil treatments | $ 819 | $ 9,833 |
| Cost of K-line KH-30 | $ 122 | $ 1,466 |
| Cost savings | $ 697 | $ 8,367 |
| Avg.production delay (days) | 1.25 | 15 |
| Value oil Production Delay | $ 956 | $ 11,475 |
| Data used for Calculations | ||
| Price of Oil (Barrel) | $ 60 |
| Average Oil Production per day (BPD) | 8.50 |
| KH-30 treatment (PPM) | 500 |
| KH-30 usage per day (gallons) * | 0.18 |
| Cost of K-line (gallon) | $ 22.50 |
| * Usage is based the average oil production per day | |
| Well Name |
Type of well | Well depth in feet |
Water amount % |
API | date of initial treatment |
|
| KS #1 | pumping | 3,900 | 0% | 26 | 1-Oct-05 | |
| Well problem |
Hot oil treatments required bi-weekly due to high parraffin content | |||||
| Solution | Mix 15 gallons of KH-30 with with 5 bbl of lease crude on top. Let the well soak over night. |
|||||
| KS #1 | |
| KS #1 | oil production (BNPD) |
| Before | 35 |
| After | 55 |
| Increase | 20 |
| Perc. Increase | 57% |
| Well Name | Type of well / age |
Well depth in feet |
Water amount % |
API | date of initial treatment |
|
| CO-178 COORA | pumping, 56 yrs. | 5,840 | 0% | 20 | 4-Nov-05 | |
| Well problem |
Low production due to Paraffin sludge deposits | |||||
| Solution | Blended 4 drums of KX-100 with 4 drums of diesel and then followed that with 16 drums of diesel and 8 drums of light crude oil. The well was shut in for 48 hours, and it was then put back into production. |
|||||
| CO-178 COORA | ||
| CO-178 COORA | oil production (BNPD) | gas production (BNPD) |
| Before | 3 | 0 |
| After | 29 | 0 |
| Increase | 26 | 0 |
| Perc. Increase | 867% | 0 |
| Wells | Before | After | Initial Percentage improvement |
| GS 230 | 12 | 156 | 1200% |
| 11M-254 | 55 | 371 | 575% |
| GVJ-6 | 89 | 158 | 78% |
| 11M258 | 120 | 190 | 58% |
| GS-41 | 24 | 32 | 31% |
| GS 432 | 24 | 27 | 13% |
| Average per Well |
54 | 156 | 188% |
| Well Name |
Type of well | Well depth in feet |
Water amount % |
API | date of initial treatment |
|
| GS 230 | Gas lift | 4380 | 22% | 27.3 | 26-Jul-04 | |
| Well problem |
High Parrafin Build up and high parrafin in the crude | |||||
| Solution | Mix 4 drums of KX-91 with 140 barrels of oil and pump downhole. Wait 48 hours before starting well production. No Continuous Injection. |
|||||
| GS 230 | oil production (BNPD) |
| Before | 12 |
| After | 156 |
| Increase | 144 |
| Perc. Increase | 1200% |

| Well Name |
Type of well | Well depth in feet |
Water amount % |
API | date of initial treatment |
|
| 11M-254 | gas lift | 12022 | 10% | 22.4 | 3-Jul-04 | |
| Well problem |
Aspaltene content in the crude causing blockage in the perforations | |||||
| Solution | Mix 9 drums of KX-91 with 200 barrels of gasoil and pump downhole. Wait 48 hours before starting well production. No Continuous Injection. |
|||||
| 11M-254 | oil production (BNPD) |
| Before | 55 |
| After | 371 |
| Increase | 316 |
| Perc. Increase | 575% |

| Well Name |
Type of well | Well depth in feet |
Water amoun t % |
API | date of initial treatment |
|
| GVJ-6 | pumping well | 4940 | 30% | 13.9 | 18-Jun-04 | |
| Well problem | High pressure 800 to 1000 psi in the well head | |||||
| Solution | Mix 4 drums of KX-9 and 1 drum of KH-30 with 265 barrels of gasoil and pump downhole. Wait 48 hours before starting well production. No continuous injection. |
|||||
| GVJ-6 | oil production (BNPD) |
| Before | 89 |
| After | 158 |
| Increase | 69 |
| Perc. Increase | 78% |

| Well Name |
Type of well | Well depth in feet |
Water amoun t % |
API | date of initial treatment |
|
| 11M258 | Gas lift | 4380 | 0% | 19.8 | 13-Sep-04 | |
| Well problem | High Asphaltene Build up downhole | |||||
| Solution | Mix 10 drums of KX-91 with 215 barrels of oil and pump downhole. Wait 48 hours before starting well production. No Continuous Injection. |
|||||
| 11M258 | oil production (BNPD) |
| Before | 120 |
| After | 190 |
| Increase | 70 |
| Perc. Increase | 58% |

| Well Name |
Type of well | Well depth in feet |
Water amoun t % |
API | date of initial treatment |
|
| GS-41 | Gas lift well | 5045 | 34% | 26.3 | 21-Jun-04 | |
| Well problem | High Parrafin Build up and high parrafin in the crude | |||||
| Solution | Mix 4 drums of KX-91 with 70 barrels of oil and pump downhole in 2 stages. Wait 48 hours before starting well production. No continuous injection. |
|||||
| GS-41 | oil production (BNPD) |
| Before | 24 |
| After | 31.5 |
| Increase | 7.5 |
| Perc. Increase | 31% |