| Well Name |
Type of well | Well depth in feet |
Water amoun t % |
date of initial treatment |
|
| Well G | Deviated hole with sour gas flowing well with a plunger lift |
4470 | 7% | 23-Dec-04 | |
| Well problem | Parrafin in the plunger and downhole | ||||
| Solution | Mix 4 drums of KX-100 with 30 barrels of oil and pump downhole.. Wait 48 hours before starting production No Continuous Injection. | ||||
| Well G | oil production (BNPD) | gas prod.(Mcf per day) |
| Before | 150 | 700 |
| After | 180 | 700 |
| Increase | 30 | 0 |
| Perc. Increase | 20% | 0% |