| Well Name |
Type of well | Well depth in feet |
Water amount % |
API | date of initial treatment |
|
| 11M-254 | gas lift | 12022 | 10% | 22.4 | 3-Jul-04 | |
| Well problem |
Aspaltene content in the crude causing blockage in the perforations | |||||
| Solution | Mix 9 drums of KX-91 with 200 barrels of gasoil and pump downhole. Wait 48 hours before starting well production. No Continuous Injection. |
|||||
| 11M-254 | oil production (BNPD) |
| Before | 55 |
| After | 371 |
| Increase | 316 |
| Perc. Increase | 575% |
