| Well Name |
Type of well | Well depth in feet |
Water amount % |
API | date of initial treatment |
|
| GS 230 | Gas lift | 4380 | 22% | 27.3 | 26-Jul-04 | |
| Well problem |
High Parrafin Build up and high parrafin in the crude | |||||
| Solution | Mix 4 drums of KX-91 with 140 barrels of oil and pump downhole. Wait 48 hours before starting well production. No Continuous Injection. |
|||||
| GS 230 | oil production (BNPD) |
| Before | 12 |
| After | 156 |
| Increase | 144 |
| Perc. Increase | 1200% |
